Slides of the exterior construction, from start up to 14 October.
If this looks fuzzy, don’ t adjust your monitor. That softness is an artifact from the slide show software.
Posted in During, New Design, Picture of the Day, tagged 2009, exterior, narthex, tower on 18 October 2009 | Leave a Comment »
Slides of the exterior construction, from start up to 14 October.
If this looks fuzzy, don’ t adjust your monitor. That softness is an artifact from the slide show software.
Posted in During, Picture of the Day, tagged 2009, exterior, narthex, tower on 9 October 2009 | Leave a Comment »
Wednesday 7 October: The steel framing for the rose window and the main doors has been installed. The cleristory is roofed in, and temporary windows have been installed.
Note: Due to plague in the house, we missed getting a photo last week.
Posted in During, Picture of the Day, tagged 2009, exterior, narthex, tower on 27 September 2009 | Leave a Comment »
Wednesday 23 September: Last week, most of the school kids were watching in rapt attention as the builders used a crane to lift and install the roof. More brickwork is in, and the front is starting to take shape. The next step is to install the steel for the windows.
Posted in During, Picture of the Day, tagged 2009, exterior, narthex, tower on 20 September 2009 | Leave a Comment »
Wednesday 16 September: The builders have roofed in the clerestory. The tower is at full height. At around noon, the builders boomed up the roof.
Posted in During, Picture of the Day, tagged 2009, exterior, narthex, tower on 15 September 2009 | Leave a Comment »
Wednesday 9 September: The tower climbs to the window level, and the wings of the narthex are forming. In the main church, the builders added in the beam across the center of the clerestory. Compare this view to six weeks ago on 29 July.
Posted in During, Picture of the Day, tagged 2009, exterior, narthex, tower on 5 September 2009 | Leave a Comment »
Wednesday 2 September: The foundation has been cured, and now the masons start to work. The tower starts to take shape. In the main church, the builders have started removing the roof over the area where the clerestory will be.
Posted in During, Picture of the Day, tagged 2009, exterior, narthex on 19 August 2009 | Leave a Comment »
Wednesday 19 August: The work continues. The new foundation has been excavated and formed. The deep piers are going in today and tomorrow. If the weather holds, we should have masons out working on the tower in a week. Compare this view to three weeks ago on 29 July.
Posted in Before, Historical, Picture of the Day, tagged 2009, crucifix, exterior on 18 August 2009 | Leave a Comment »
Posted in Architecture, New Design, tagged beauty, design, exterior, narthex, priorities, redo, steeple on 16 August 2009 | Leave a Comment »
The summer 2009 issue of ArchitectColorado includes two features on projects at Holy Trinity. ArchitectColorado is the professional journal of the Colorado Component of the American Institute of Architects. Our architect, Adam Hermanson is a member of the AIA. This issue has a focus on religious architecture. Holy Trinity and Integration Design Group are featured in [...]
Posted in During, Picture of the Day, tagged sanctuary, Eckert, overflow, steeple, exterior, narthex, 2009 on 16 August 2009 | Leave a Comment »
On Friday, 14 August 2009, Parishioner Allan Eckert sent this note about an on-line album he’s created:
Here are some photos I took of the remodeling of Holy Trinity. Please let anyone else that might be interest know about this link. Thanks.
Here are five excerpts from Allan’s album. Click each image for a larger view.
The full [...]